500L Professional Beer Brewing Equipment

Basic Info

Model NO.:ZH-500LComposition:CIP Cleaning Machine
Processing Material:Agronomic ProductsProcess:Ferment
Package:Film and Wooden CaseSpecification:CE

Origin: Shangdong Province, China(Mainland)
Material:Stainless Steel 304 or Red CopperShape:Cylinder and Cone
Heaitng Method:Electric Heating, Steam Heating, Gas HeatingColor:Stainless Steel 304 or Red Copper
Insulation Material:PolyurethaneInsulation Thickness:100mm
Polishing Precision:0.4umCooling Medium:Ice Water or Glycol
Cooling System:Ice Water RefrigeratorProduction Capacity:30 Sets Every Month

We are the mirco brewing equipment specialist, because of profession, so being respected! ! ! ! !



1. Production information

The whole beer equipment is consisted of Mash system, Fermentation system, Refrigeration system, Control system and CIP cleaning system. The tank of the system all adopts Red copper and S. S 304, and the system also have high automatic control capacity.

Simple operation, PLC automatic control system, PLC semi-automatic control system.

Equipments characteristics: Small investment. Quick effectiveness, high quality, lower prices, the investment repayment is fast, the service life of equipment is long, easy operation, lower cost. Strong technical force.

At the same time if you have requirements, we could design and produce the products you need!


2. Process

1. (1)Infiltrating, crushing malt
(2)Heating the brewing water in brew kettle
2. (1)Pumping a certain amount of appropriate temperature of hot water into mash tun
(2)starting rotary blade, uniformly putting into material, stopping rotary blade when stirring uniformly. Timing saccha
(3)Controlling of water temperature and water quantity, keeping appropriate saccharification temperature, stirring in every 15 minutes
3. (1)refluxing turbid wort when saccharification ends. Observing through the sight glass, beginning to filter when wort is charified
(2)washing the tank when the tank exposes in the filtration process, water temperature 78
(3)Continue to filtrate after washing the tank, until sugar content meets the requirements. Stopping washing the tank and filtrating
4. (1)pumping all the wort into brew kettle, heated to boiling for 60 to 90 minutes
(2)in the first ten minutes of boiling, batch adding bitter hops
(3) adding sweet hops before the end of boiling

5. (1)after the end of boiling, immediately pumping wort into lauter tun&whirlpool tank.
(2)starting to cyclotron precipitation, lay aside for 30 minutes
6. (1)starding cold water valve and wort pump at the same time, cooling wort to a certain temperature in the plate heat exchanger
(2) after wort is cooling, oxygenating to 8mg/l, pumping wortto fermentation tank
(3)adding special beer yeast into fermentation tank to ferment
7. (1)controlling fermentation temperature and pressure, when brix drop to 4.2, sealing tank to maintain pressure, automatically heating up to 12 ° C, deoxidating cold diacetyl
(2)at the end of deoxidating cold diacetyl, cooling uniformly and slowly, precipitating yeast in this process
(3) wine temperature drop to 1 to 2 ° C can be stored, tank bottom yeast mud can be recycled



                                       Model
Eqiupment List
ZH-0.5                                        Model
Eqiupment List
ZH-0.5

Milling
System
Malt Mill 300Kg/h CIP Cleaning
System
Washing Tank 50L/2pcs
Work Bin accessory Washing Pump 3m³/h

Mashing
System
Mash Tun 500L Pipeline&valves accessory
Lauter Tun 500L Cooling
System
Ice Water Tank 1500L
Wort Pump 5m³/h Cooling Machinery 4HP/2sets

Heat Exchanger 8m² Ice Water Pump 1.7m³/h

Wort Oxygenator accessory Pipeline&valves accessory

Assemble Pipeline accessory Control
System
DCS Style box2000*700*400
Fermentation
System
Fermentation Tank 500L/10pcs PLC Style box2000*700*400
Yeast Tank 12L Energy Steamed Boiler 45kg/h
Bright Beer Tank
(optional)
1000L electrical heating 45kw

Pipeline&valves accessory      


Trade Details

Description of goods Micro brewery
Capacity 100L-100HL
Material SUS304 or red copper
Warranty Three years for main equipment
MOQ 1set
Delivery time 15-40 working days, based on the capacity
Supply ability More than 100pcs,based on the capacity
Package Steel frame or wooden cases, according to your requirement
Payment term T/T
Trade term FOB/EXW
Port of loading Qingdao


Product Description